Wednesday, November 23, 2011

Drywall Love Continued...

Our house is totally drywalled!!!!  Well, except for a smidge that needs to be done around the door that leads from the garage into the basement.  But let's be serious...who cares about that small piece, because the rest is all done and ready for spackle!

Speaking of spackle...the crew that is tackling our job will begin today.  We are hoping that they put in a day or two on Friday and Saturday, and then they'll wrap up early next week.  I cannot wait for this step of the process to be done.  Once completed, our tile floors can start to go down, and then comes our bathroom fixtures!

This Thanksgiving, I will not only be giving thanks for my wonderful family, the health of that wonderful family and all the blessings that I have been given in life...I will also be giving thanks for a soon-to-be-functioning bathroom back in our house!

Main bath doorway is now widened!

No more tiny doorway.

We have walls in the main bath!!

Our shower/tub combo in the main bath.

Area for the two main bath vanities...and my hubby trying to plug a light in.

Main bath.

Main bath, view towards the doorway.

My master closet, totally drywalled.

Master shower walls getting prepped for tile.

Garage header installed and drywalled so we can properly put fire collars around the PVC pipes.

Back of the garage wall, mostly drywalled.

Other side of the garage wall, mostly drywalled.
Happy Thanksgiving everyone! :)

3 comments:

  1. Yipee! It's really looking like a house now! It looks like a nice size main bath.

    Happy Thanksgiving!

    ReplyDelete
  2. Thanks for stopping in guys! Have a wonderful Thanksgiving! :)

    ReplyDelete

Note: Only a member of this blog may post a comment.